Saturday, November 16, 2013

Subfloor and Framing

Due to the Rememberance day weekend, our framing crew was not available until Tuesday morning, thus a 4 day work week.  We over engineered the floor joists to build a stiffer floor, the joists were laid out to miss key drain lines for plumbing.  The entire subfloor was installed using subfloor adhesive and screws to eliminate the possibility of any floor squeeks.  Window & door placements were reviewed, laid out and all of the exterior walls were standing by the end of thw week.