Saturday, November 9, 2013
Walls, damp proofing and drainage
On Monday November the 4th we stripped the footings and started setting the wall forms. Underground plumbing was installed and all inspections were completed. Walls were poured on Wednesday and stripped on Thursday. On Friday morning the foundation damp proofing was completed, 4" perforated pipe was installed for the weeping tile, 1" washed broken rock and landscape fabric was used to cover all the weeping tile. Rainwater drain lines were installed at the 4 corners of the house. Weeping tile and rain water leaders all drain to a 7' x 7' x 8'deep rock pit. The rock pit was filled with 3"-6" cobble and protected with landscape fabric. Back filling was completed on Monday November 11th.
Subscribe to:
Post Comments (Atom)
I’ve been checking out this blog it’s been really helpful. I was not understanding what I was doing. But your blog helped me a lot. Thank you very much and all the best in future.
ReplyDeleteDamp Proofing companies